For a stable foundation
A durable road starts with a stable foundation. Compaction testing of sand beds and foundation layers is essential to prevent settlement, rutting and pavement damage.
Traffic and construction loads put continuous pressure on the subgrade. It is therefore important that this load is evenly distributed over the foundation layers and the natural subsoil.
With compaction research you demonstrate that your project meets the technical requirements and quality standards, such as RAW and CROW.
Measuring, assessing and adjusting
We perform accurate measurements to determine whether the sand bed or foundation material is sufficiently compacted according to the specified requirements.
In doing so, we look at:
- Density of the material
- Moisture content
- Bearing strength of the subsoil
Based on the results, you will receive a clear report with practical recommendations. If necessary, the work can be adjusted in time to still meet the standards.
Our expertise in compaction measurements
Normec has extensive experience and the right equipment to perform reliable compaction measurements. We know the applicable standards and provide an objective assessment of the quality.
By steering for the right compaction from the beginning, you lay a solid foundation for a sustainable project.
What does this mean specifically for you?
-
1.
You prevent settlement, deformation and rutting
-
2.
You meet contractual requirements and guidelines
-
3.
You extend the service life of the structure
-
4.
You have reliable measurement data for delivery
-
5.
You prevent failure costs through timely control
Build with a strong foundation
A good foundation prevents problems in the future. By applying compaction testing structurally, you work on sustainable and low-maintenance infrastructure. With our support, you ensure quality, certainty and a longer life for your construction.
Want to know more about compaction testing?
Frequently Asked Questions
-
This is the measurement of the density and quality of a sand bed or foundation layer.
-
Because insufficient compaction can lead to settlement and structural damage.
-
Among others, the RAW and CROW guidelines.
-
Density, moisture content and bearing capacity of the substrate.
-
Yes, including clear conclusions and recommendations.
-
Yes, based on the measurement results, the work can be adjusted in a timely manner.